MARINE PROJECTS
ENL - NOVA SCOTIA GROUNDING SITE AT BIG LORRAINE – 2016
Extension to an existing access road, grounding site including rubble mound breakwater structures and infilling of the existing area behind the breakwater, grounding element wells, cable trenches, junction pits, pull box, buried conduits, and precast concrete foundations.


CBRM – SECOND MARINE BERTH CONSTRUCTION – 2018
Supply, deliver and install steel pipe piles, seating pile tips into sound bedrock, cutting piles at pile head, design and fabrication of splices, pile shoes, reinforcing spacers, cleaning out of overburden and bedrock to pile tip, supply fabrication and installation of reinforcing cage and concrete grout within the casing, embedded plate pad-eye. The CBRM Second Marine Berth is the largest Marginal Wharf in Eastern Canada.


PEV – WHARF APPROACH DREDGING PROJECT – 2018
Dredge approximately 210,000 cubic meters of sediments from the PEV Wharf Approach located within the South Arm of Sydney Harbour and deposit the spoils into the confined disposal facility (CDF) located within Blast Furnace Cove.


PWGSC – SOURIS FERRY TERMINAL DREDGING – 2021
Basin and channel dredging, construction of a rubble mound containment cell at the Souris Transport Canada Ferry Terminal in Souris, PEI.


RISO – FLOATING PLANT DREDGING, PEI – 2021
Standing offer dredging throughout Prince Edward Island, using floating plant dredging excavator, Amphibex 450.

